Eco – Climate Solutions (ECS) mechanical contractors in Perth, were asked to refurbish the air conditioning and electrical works at the new 99 Bikes store in Belmont in Perth, WA.
Their plan was to remove the ceilings and all the ductwork and they approached Airius about a design solution for mixing and distributing the conditioned air around the space, without ductwork.
Airius proposed the use of 7 x Airius S1 Pearl fans and a speed controller, to be located in suitable positions to suit the customer’s requirements and ensure mixing and distribution. Across the summer of 2018-19 the solution has been a great success.





